Foam Jacking

  • 3/8 hole
  • 4lbs cubic ft
  • Cures in :30 minutes
  • Water resistant
  • Accepted in Federal and State Roads
  • Always mixed correctly
  • Can stabilize soil
  • Won’t break down
  • Usually cheaper and quicker
  • Polyurethane has technical data sheets and Mud Jacking does not have technical data sheets.
  • Foam Jacking won’t leech into ground water

Mud Jacking

  • 1 1/4-2” hole
  • 100-1150 lbs. cubic ft
  • cures in 24-48 hours
  • Will absorb water
  • Not accepted
  • All contractors claim they have the best
  • Can’t stabilize soil
  • Will break down
  • Labor intensive