Foam Jacking
- 3/8 hole
- 4lbs cubic ft
- Cures in :30 minutes
- Water resistant
- Accepted in Federal and State Roads
- Always mixed correctly
- Can stabilize soil
- Won’t break down
- Usually cheaper and quicker
- Polyurethane has technical data sheets and Mud Jacking does not have technical data sheets.
- Foam Jacking won’t leech into ground water
Mud Jacking
1 1/4-2” hole
100-1150 lbs. cubic ft
cures in 24-48 hours
Will absorb water
Not accepted
All contractors claim they have the best
Can’t stabilize soil
Will break down
Labor intensive